Cowling Installation

 

The cowling was similar to the hatch to construct and was built basically the same way.  The frame was built first and the wiring was completed as much as possible as access was going to be tricky once the cowling goes on.

 

Here is the cowling frame.

 

Another view.

 

Here is all the wiring and steering in place.  The steering cable is not connected here.

 

Now the plywood was cut and fitted in place and glued down.

 

Access underneath the cowling was now a bit tricky.  Nice legs eh!

 

Now the Blackwood and Celery Top Pine goes on just like the Hatch.